Main Image

Site Preparation Contractor Village

Client: Shell Iraq Petroleum Development
Location: Basra
Cost: 4,052,317 USD
Completion Date: 2016-01-12

Description:

To carry out the Site Preparation Works for the Contractor Camps area, which has been designated to house all future contractor camps for the Majnoon Oilfield work, includes providing 76,000 cubic meter type E filling materials with leveling and compaction, excavating 1,560 meter ditch, provide 60,000 cubic meter of type B sub base course 1,650meter road works, perform and install 1,900 pieces of precast T-walls and 3,500 meter of chain link fence and 4 watching towers.