Civil, Building, and Steel Structure Works for CPS7 Facility Project

Client: CPECC behalf of ROO Rumaila Operation Organization (ROO)–Projects Dep. (Water Injection(
Location: Basra
Cost: 5,295,786 USD
Completion Date: 2023-03-10

Description:

1-All civil and foundation work required in the drawings and specifications, including all the necessary pipe supports, pipe road crossings, skid & equipment foundations, open drain pond, pits, and drains, sheds, grading and paving, road and fence works, and all E&I cable trenches and foundations. 17,000 m3 excavation, 15,000 m3 Backfilling, 3,000 M3 Reinforced Concrete, 4.500 m2 Roads, 750 m High Security Fence, and 450 Tons of Steel Structure shades.
2- Buildings Construction
Construction of a reinforced concrete framed single-story building, including foundations, beams, columns, masonry walls, plastering work, and roof waterproofing, all embedded items for the water supply & lighting, and other building materials. Control room, Office welfare, lab, Maintenance & Guard buildings. Total Area 1,370 m2.